| IMPORTANT INSTALLATION POINTS |
| 1. |
Before installation, store vinyl cladding on flat ground, preferably out of direct sun. If stored in direct sun, cut open the ends of packs to allow trapped heat to escape. |
| 2. |
Use corrosion resistant nails or screws with large head. |
| 3. |
Do not screw or fix tightly. Use the rollover nail hem on the nailing strip as a hammer stop to prevent tight fixing. Vinyl cladding must be able to move during expansion and contraction. |
| 4. |
Nail or screw in the centre of the oval nailing slot to allow for movement. Use a nail hole punch to create extra slots if needed. |
| 5. |
Allow a minimum 5mm space in each J trim and corner post channel to allow for expansion. |
| 6. |
Use a floating overlap joint to allow for expansion of horizontal boards. Do not seal the join with silicone or glue. |
| 7. |
When connecting astragals, vent pipes or other fixtures to a wall which has been clad, screw holes must be made larger than the screw or nail to allow for movement. Fill the hole with silicone sealer for waterproofing. |
| 8. |
Vertical installation –position board in trims then fix loosely at top of highest nailing slot to hang the board. Install other fasteners in centre of nail slots. |